{"id":19009,"date":"2026-09-24T15:33:09","date_gmt":"2026-09-24T13:33:09","guid":{"rendered":"https:\/\/jansametal.com\/industrial-building-steel-or-concrete\/"},"modified":"2026-09-30T11:37:15","modified_gmt":"2026-09-30T09:37:15","slug":"industrial-building-steel-or-concrete","status":"publish","type":"post","link":"https:\/\/jansametal.com\/en\/industrial-building-steel-or-concrete\/","title":{"rendered":"Steel or Concrete Industrial Building: A Guide to Choosing the Best Option Without Delays or Cost Overruns"},"content":{"rendered":"\n<div class=\"wp-block-uagb-image uagb-block-fb60d0dd wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg\" alt=\"\" class=\"uag-image-18679\" width=\"1024\" height=\"576\" title=\"nave_acerovshormigon\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-93dcd06d\"><h2 class=\"uagb-heading-text\"><strong>You&#8217;re going to invest hundreds of thousands of euros in an <strong>industrial building,<\/strong> and deep down, you&#8217;re probably concerned about two things above all: keeping the budget under control and completing the project on time.<\/strong><\/h2><\/div>\n\n<p class=\"wp-block-paragraph\">that the budget doesn\u2019t spiral out of control and that it\u2019s completed on time. And for good reason: according to industry data, most industrial construction projects experience delays and cost overruns compared to what was originally agreed upon. The good news is that most of these deviations aren\u2019t just bad luck: they\u2019re decided on paper, before the first piece of equipment even arrives on site. And the most critical decision of all is the one that almost no one takes the time to analyze carefully:   <\/p>\n\n<h2 class=\"wp-block-heading\" style=\"margin-top:50px;margin-bottom:30px;font-size:20px\"><strong>Steel or concrete industrial building?<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">In this guide, we explain, without unnecessary technical jargon, what each system entails in terms of cost, timeline, and flexibility, and how to choose the one that truly fits your project so you won&#8217;t run into any surprises.<\/p>\n\n<h2 class=\"wp-block-heading\" style=\"padding-top:50px;font-size:20px\"><strong>The Two Major Decisions That Shape Your Industrial Building Project<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">When it comes to seismic engineering, Japan remains the global benchmark.<\/p>\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:-20px\">Before requesting quotes, it\u2019s important to understand that, in an industrial warehouse, almost all the money and almost all the time are spent on two areas:<\/p>\n\n<div class=\"wp-block-uagb-icon-list uagb-block-0dd4cdeb\"><div class=\"uagb-icon-list__wrap\">\n<div class=\"wp-block-uagb-icon-list-child uagb-block-cf87eae1\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>The structure.<\/strong>  It is the framework that supports the building and determines the spans (the distance between columns), the clear height, and the load-bearing capacity.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-8d26f308\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>The enclosure.<\/strong>  It is the building envelope\u2014the facades and roof\u2014which determine the building&#8217;s appearance, insulation, weather tightness, and energy consumption.<\/span><\/div>\n<\/div><\/div>\n\n<p class=\"wp-block-paragraph\">Getting the structure right is what prevents cost overruns and delays. And that\u2019s where the choice between steel and concrete makes all the difference. <\/p>\n\n<div class=\"wp-block-uagb-separator uagb-block-78968a18\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><\/div><\/div>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-60e51e17\"><h3 class=\"uagb-heading-text\"><strong>Steel vs. Concrete Industrial Buildings: A Real-World Comparison<\/strong><\/h3><\/div>\n\n<p class=\"wp-block-paragraph\">The structure withstands seismic forces through structural members specifically designed for that purpose.<\/p>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-0308f226\"><h3 class=\"uagb-heading-text\"><strong>POINTS TO CONSIDER:<\/strong><\/h3><\/div>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-495220e6\"><h3 class=\"uagb-heading-text\"><strong>Flexibility: The Factor That Will Determine the Future of Your Warehouse<\/strong><\/h3><\/div>\n\n<p class=\"wp-block-paragraph\">The most important difference between a steel building and a precast concrete building is that the latter, once built, cannot be modified. And the need to modify it will arise sooner than you think: with the explosion of artificial intelligence, technological innovation is set to accelerate exponentially, and nothing will ever be the same again. Industrial buildings will have to adapt to new robotic systems, and their structure must be adaptable to the new <em>layouts<\/em> required by the implementation of robotic lines throughout the entire chain: unloading, storage, production, and <em>pick &amp; load<\/em>.  <\/p>\n\n<p class=\"wp-block-paragraph\">In addition, precast concrete has inherent limitations:<\/p>\n\n<div class=\"wp-block-uagb-icon-list uagb-block-55d3de18\"><div class=\"uagb-icon-list__wrap\">\n<div class=\"wp-block-uagb-icon-list-child uagb-block-98008b90\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Dimensional limitations.<\/strong>  The parts are manufactured using a mold, so their dimensions are determined by the mold.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-ddadc658\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Limited connections.<\/strong>  It does not allow for direct connections: any joint is made using mechanical or chemical anchors or flanges, which are unlikely to withstand heavy loads.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-014560a4\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Isostatic system.<\/strong>  By their very nature, precast concrete buildings are isostatic structures\u2014one of the most primitive structural solutions\u2014which do not offer the millimeter-level precision of bolted steel.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-8092ee08\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Tolerances in centimeters, not millimeters.<\/strong>  In addition, sagging and misalignment are common issues that, although they may be concealed by the enclosure, prove critical when implementing automated storage systems or smart manufacturing systems.<\/span><\/div>\n<\/div><\/div>\n\n<p class=\"wp-block-paragraph\"><strong>Conclusion:<\/strong> If your business model keeps pace with technology, your warehouse must be able to evolve alongside it, without limits. That is exactly why we have designed our <a href=\"https:\/\/www.jansametal.com\/janspan\/\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-ast-global-color-0-color\">JANSPAN pre-engineered warehouses<\/mark><\/strong><\/a>. <\/p>\n\n<h2 class=\"wp-block-heading\" style=\"padding-top:50px;font-size:20px\"><strong>TIMELINES: Comparison for a 6,000 m\u00b2 warehouse<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">Precast concrete requires the fabrication and curing of components, as well as their transportation and installation using heavy equipment. This entails a minimum production lead time that, depending on the manufacturer\u2019s order volume, ranges from 2 to 4 months. <\/p>\n\n<p class=\"wp-block-paragraph\">Added to this are the logistical challenges: the components often require special transportation (with traffic restrictions), and each truck carries only 2 to 4 components. For a 6,000 m\u00b2 warehouse, we\u2019re talking about 38\u201340 trucks for the structure (24 of which are special-transport shipments), 6\u20137 for the roof, and 50\u201360 for the facade panels\u2014for a total of between 94 and 107 trucks. <\/p>\n\n<p class=\"wp-block-paragraph\">An <strong>industrial steel building<\/strong>, on the other hand, is manufactured in one month\u2014while the foundations are being laid\u2014and arrives on-site ready for assembly. When the system is pre-engineered and manufactured using a computer numerical control (CNC) process, the assembly speed increases dramatically. As a reference, with our system, it\u2019s possible to assemble up to 10,000 m\u00b2 of structure in just 10 days.    <strong>And all of this is transported using just 18\u201320 trucks: up to five times fewer trips than a prefabricated concrete structure.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Summary: 6,000 m\u00b2 warehouse<\/strong><\/p>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Concept<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Precast concrete<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>JANSPAN Steel<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Manufacturing<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">2 to 4 months<\/td><td class=\"has-text-align-center\" data-align=\"center\">\u22481 month (concurrently with the foundation work)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Trucks<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">94\u2013107 (24 specials)<\/td><td class=\"has-text-align-center\" data-align=\"center\">18-20<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Tolerances<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">centimeters<\/td><td class=\"has-text-align-center\" data-align=\"center\">millimeters<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Expansion or modification<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">That&#8217;s not possible<\/td><td class=\"has-text-align-center\" data-align=\"center\">Yes, no demolitions<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-bd3d8e98\"><h3 class=\"uagb-heading-text\"><strong><strong>Cost: Look at the total cost, not just the price per square meter<\/strong><\/strong><\/h3><\/div>\n\n<p class=\"wp-block-paragraph\">In this case, it\u2019s important to look beyond the price per square meter of the bare structure. The total cost of an industrial building includes the foundation, exterior walls, infrastructure, transportation, construction timelines, the cost of CO\u2082 emissions, financing, and unforeseen construction costs. <\/p>\n\n<p class=\"wp-block-paragraph\">To span the same distances, a steel structure weighs between 5 and 10 times less than a reinforced concrete one, especially if it is fabricated using <strong>variable-section profiles optimized<\/strong> for each span. Less weight means a lighter, more economical foundation and cheaper transportation. And every week saved on-site is money not spent on equipment rental, labor, and interest.  <\/p>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-48fd68fd\"><h3 class=\"uagb-heading-text\"><strong>Brilliant lighting and<\/strong><strong>flexibility<\/strong><\/h3><\/div>\n\n<p class=\"wp-block-paragraph\">If your business requires <strong>open spaces without interior columns,<\/strong> storage, logistics, production lines, or overhead cranes, steel is clearly the best choice. It allows you to span large distances with slender structures and leaves the interior open so you can lay out the facility however you like. <\/p>\n\n<p class=\"wp-block-paragraph\">And there\u2019s one advantage that almost no one appreciates until they need it: a bolted-together steel warehouse can be <strong>expanded,<\/strong><strong>modified, and even dismantled<\/strong> in the future without demolition. If your business grows or changes, your warehouse grows and changes with you. <\/p>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-957239d3\"><h2 class=\"uagb-heading-text\"><strong>Sustainability and CO\u2082 Costs<\/strong><\/h2><\/div>\n\n<p class=\"wp-block-paragraph\">Structural steel is <strong>100% recyclable<\/strong> at the end of its useful life, and factory-based manufacturing processes generate far less waste and emissions on-site than traditional wet construction. For many companies, this is no longer just a bonus\u2014it is a requirement of their ESG policies and their clients. <\/p>\n\n<p class=\"wp-block-paragraph\">The new regulations resulting from the fight against climate change will severely penalize activities that generate CO\u2082. Today, many companies already factor the cost of CO\u2082 into their feasibility studies, and its impact will continue to grow. A construction system that, in transportation alone, increases CO\u2082 emissions fivefold will clearly be penalized. We are already seeing this with the Carbon Border Adjustment Mechanism (CBAM) that the EU applies to certain imports.   <\/p>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-071b1ed1\"><h2 class=\"uagb-heading-text\"><strong>The advantage of concrete<\/strong><\/h2><\/div>\n\n<p class=\"wp-block-paragraph\">To be fair: Concrete naturally offers greater thermal mass and intrinsic fire resistance, and in certain highly aggressive environments, it may make sense. But both of these issues can be perfectly addressed in a steel structure using the following solutions <\/p>\n\n<p class=\"wp-block-paragraph\">Appropriate: highly insulated exterior wall panels and passive fire protection systems that ensure the resistance (R\/EI) required by regulations.<\/p>\n\n<div class=\"wp-block-uagb-separator uagb-block-ed091878\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><\/div><\/div>\n\n<h2 class=\"wp-block-heading\" style=\"margin-top:50px\"><strong>Why Prefabricated Steel Buildings Have Become So Popular<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">What you&#8217;re seeing is the result of what&#8217;s known as industrialized construction: instead of building the structure haphazardly on-site, it&#8217;s designed and manufactured in a controlled environment with millimeter precision, and construction on-site becomes a quick and clean assembly process.<\/p>\n\n<p class=\"wp-block-paragraph\">At Jansa Metal, we sum it up this way: building your warehouse should be like putting together a LEGO set. Each piece arrives numbered, with its own assembly instructions, and fits exactly where it\u2019s supposed to. That approach eliminates the two initial fears at their root and is based on three pillars:  <\/p>\n\n<ol class=\"wp-block-list\">\n<li><strong>Engineering comes before construction.<\/strong>  With proper structural analysis and BIM modeling, problems are solved on the computer screen rather than on the job site, where every mistake costs time and money.<\/li>\n\n\n\n<li><strong>In-house manufacturing with guarantees.<\/strong> As manufacturers holding <strong>EN 1090<\/strong> certification <strong>(EXC3, CE marking)<\/strong>, we have complete control over quality and deadlines, with no middlemen to drive up the cost.<\/li>\n\n\n\n<li><strong>Dry screw-on assembly.<\/strong>  With no high-altitude welding or curing times, construction proceeds without interruption and with fewer risks.<\/li>\n<\/ol>\n\n<p class=\"has-ast-global-color-1-color has-text-color has-link-color wp-elements-1 wp-block-paragraph\">You can see how we apply this from start to finish in<mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-ast-global-color-0-color\"> <a href=\"https:\/\/jansametal.com\/en\/jansa-process\/\" data-type=\"link\" data-id=\"https:\/\/jansametal.com\/proceso-jansa\/\"><strong>our workflow.<\/strong><\/a><\/mark><\/p>\n\n<div class=\"wp-block-uagb-separator uagb-block-3974c2ab\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><\/div><\/div>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-276d3068\"><h3 class=\"uagb-heading-text\"><strong>Not all boats are the same: choose based on how you&#8217;ll use it<\/strong><\/h3><\/div>\n\n<p class=\"has-ast-global-color-1-color has-text-color has-link-color wp-elements-2 wp-block-paragraph\">The system <a href=\"https:\/\/jansametal.com\/en\/janspan\/\" data-type=\"link\" data-id=\"\/naves-preingeniadas\/\"><strong><u>JANSPAN<\/u><\/strong> <\/a>system does not use catalog modules: each warehouse is designed specifically for its location, use, and floor area. These are the most common scenarios: <\/p>\n\n<div class=\"wp-block-uagb-icon-list uagb-block-ffc5e841\"><div class=\"uagb-icon-list__wrap\">\n<div class=\"wp-block-uagb-icon-list-child uagb-block-2b9ab1d5\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Industrial and logistics facilities:<\/strong> large, open-plan spaces, clear heights of 12 m or more, large-format sectional doors, and provisions for overhead cranes.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-738ac386\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Agricultural and livestock buildings:<\/strong> structures designed to withstand severe environmental conditions, with partial or full enclosures and roofs optimized for natural ventilation.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-077f9351\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M256 0C114.6 0 0 114.6 0 256c0 141.4 114.6 256 256 256s256-114.6 256-256C512 114.6 397.4 0 256 0zM406.6 278.6l-103.1 103.1c-12.5 12.5-32.75 12.5-45.25 0s-12.5-32.75 0-45.25L306.8 288H128C110.3 288 96 273.7 96 256s14.31-32 32-32h178.8l-49.38-49.38c-12.5-12.5-12.5-32.75 0-45.25s32.75-12.5 45.25 0l103.1 103.1C414.6 241.3 416 251.1 416 256C416 260.9 414.6 270.7 406.6 278.6z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Commercial and retail buildings:<\/strong> customizable facades, integrated skylights, and configurations that comply with public space regulations.<\/span><\/div>\n<\/div><\/div>\n\n<p class=\"has-ast-global-color-1-color has-text-color has-link-color wp-elements-3 wp-block-paragraph\">And if your project goes beyond a single warehouse\u2014such as technical offices, mezzanines, or an entire industrial building\u2014you can combine it with our <strong><a href=\"https:\/\/jansametal.com\/en\/jansbuild\/\" data-type=\"link\" data-id=\"\/edificios-en-acero\/\">JANSBUILD steel buildings<\/a><\/strong> and a system of exterior walls and roofs that ensures the insulation and weatherproofing you need.<\/p>\n\n<p class=\"has-ast-global-color-1-color has-text-color has-link-color wp-elements-4 wp-block-paragraph\">You can see real-world examples in <a href=\"https:\/\/jansametal.com\/en\/projects\/\" data-type=\"link\" data-id=\"\/proyectos\/\"><strong><u>our industrial and logistics projects<\/u><\/strong>.<\/a><\/p>\n\n<div class=\"wp-block-uagb-separator uagb-block-0d4fe1f9\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><\/div><\/div>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-5d33aad0\"><h3 class=\"uagb-heading-text\"><strong>Frequently Asked Questions About Steel Industrial Buildings<\/strong><\/h3><\/div>\n\n<p class=\"wp-block-paragraph\" style=\"padding-top:50px\"><strong>How much does it cost to build a steel industrial building?<\/strong><\/p>\n\n<p class=\"has-ast-global-color-1-color has-text-color has-link-color wp-elements-5 wp-block-paragraph\" style=\"margin-top:-20px\">The cost depends on the floor area, headroom, type of enclosure, location, and special loads. As a rough guide, the cost of the metal structure (excluding foundations and utilities) typically ranges from <strong>80 to 180 \u20ac\/m\u00b2<\/strong> depending on the complexity of the project. For a figure tailored to your specific situation, the most reliable approach is to <strong><u><a href=\"https:\/\/jansametal.com\/en\/contact\/\" data-type=\"link\" data-id=\"\/contacto\/\">request a quote<\/a><\/u><\/strong> with the planned area and intended use.  <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>How long does it take to build an industrial building?<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:-20px\">It is important to distinguish between two phases. The <strong>fabrication<\/strong> of the steel structure is completed within 4 to 10 weeks after approval of the detailed design (starting at 1 month for more standardized projects), and is carried out in parallel with the foundation work. On-site <strong>assembly<\/strong> is very fast: a 3,000 m\u00b2 building is typically assembled in 10 business days, and with the JANSPAN system of pre-engineered buildings, we can complete up to 10,000 m\u00b2 in the same timeframe, depending on the project and the assembly teams. This is a fraction of the time required for traditional construction.   <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>How long does it take to build an industrial building?<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:-20px\">It is important to distinguish between two phases. The <strong>fabrication<\/strong> of the steel structure is completed within 4 to 10 weeks after approval of the detailed design (starting at 1 month for more standardized projects), and is carried out in parallel with the foundation work. On-site <strong>assembly<\/strong> is very fast: a 3,000 m\u00b2 building is typically assembled in 10 business days, and with the JANSPAN system of pre-engineered buildings, we can complete up to 10,000 m\u00b2 in the same timeframe, depending on the project and the assembly teams. This is a fraction of the time required for traditional construction.   <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Does a steel building provide the same insulation and fire resistance as a concrete one?<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:-20px\">Yes, with the right solutions. The <strong>sandwich panel<\/strong> allows for very low thermal transmittance values (0.25 W\/m\u00b2K or lower), providing excellent insulation, and the passive fire protection ensures the structural resistance required by the Technical Building Code (CTE) for each use. <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Can a prefabricated warehouse be expanded or modified at a later date?<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:-20px\">Yes, and that&#8217;s one of its major advantages. Since these are bolted, structurally engineered structures, they can be expanded, modified, or reconfigured in the future without demolition, adapting to the growth of your business. <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>How is steel protected against corrosion?<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:-20px\">Depending on the environment, the structure is protected using our system (shot blasting, <em>shop primer<\/em>, and topcoat), which guarantees decades of durability. For particularly demanding environments, we apply C5-H protection or a duplex system (galvanized + paint). <\/p>\n\n<div class=\"wp-block-uagb-separator uagb-block-001fa4b1\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><\/div><\/div>\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-9ada9684\"><h2 class=\"uagb-heading-text\"> <br\/>Conclusion: The Decision That Avoids Surprises<\/h2><\/div>\n\n<p class=\"wp-block-paragraph\">Choosing between a steel or concrete building isn\u2019t a matter of personal preference: it\u2019s the decision that determines whether your project will be completed on time and within budget. For the vast majority of industrial, logistics, agricultural, and commercial applications, a <strong>prefabricated steel building\u2014properly engineered and manufactured in-house<\/strong>\u2014is currently the most efficient option in terms of cost, timeline, and flexibility. <\/p>\n\n<p class=\"wp-block-paragraph\">But that&#8217;s as far as the theory goes. Every site, every use, and every local regulation affects the numbers. That&#8217;s why the best next step isn&#8217;t to keep reading generic comparisons, but to plug the numbers into your project.  <\/p>\n\n<div class=\"wp-block-uagb-container uagb-block-25987a19 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-advanced-heading uagb-block-726164a1\"><h2 class=\"uagb-heading-text\">Do you have an industrial warehouse project?<\/h2><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Tell us the approximate <strong>surface<\/strong> <strong>area, the intended use, and the location<\/strong> of the land, and our engineers will prepare a <strong>no-obligation technical proposal<\/strong> with deadlines and costs tailored to your needs. Our more than 40 years of experience manufacturing metal structures and over 1,000 completed projects speak for themselves. <\/p>\n\n\n\n<p class=\"has-ast-global-color-1-color has-text-color has-link-color wp-elements-6 wp-block-paragraph\">\ud83d\udc49 <strong><a href=\"https:\/\/jansametal.com\/en\/contact\/\" data-type=\"link\" data-id=\"\/contacto\/\">Request a quote for an industrial warehouse here<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jansa Metal \u2014 Manufacturers of metal structures and steel industrial buildings. La Roca del Vall\u00e8s (Barcelona). Tel. (+34) 93 842 34 55.<\/p>\n<\/div><\/div>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>You&#8217;re going to invest hundreds of thousands of euros in an industrial building, and deep down, you&#8217;re probably concerned about two things above all: keeping the budget under control and completing the project on time. that the budget doesn\u2019t spiral out of control and that it\u2019s completed on time. And for good reason: according to [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":18681,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[85,83,90],"tags":[],"class_list":["post-19009","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-industrials","category-news"],"spectra_custom_meta":{"_pingme":["1"],"_encloseme":["1"],"_uagb_previous_block_counts":["a:90:{s:21:\"uagb\/advanced-heading\";i:12;s:15:\"uagb\/blockquote\";i:0;s:12:\"uagb\/buttons\";i:0;s:18:\"uagb\/buttons-child\";i:0;s:19:\"uagb\/call-to-action\";i:0;s:15:\"uagb\/cf7-styler\";i:0;s:11:\"uagb\/column\";i:0;s:12:\"uagb\/columns\";i:0;s:14:\"uagb\/container\";i:1;s:21:\"uagb\/content-timeline\";i:0;s:27:\"uagb\/content-timeline-child\";i:0;s:14:\"uagb\/countdown\";i:0;s:12:\"uagb\/counter\";i:0;s:8:\"uagb\/faq\";i:0;s:14:\"uagb\/faq-child\";i:0;s:10:\"uagb\/forms\";i:0;s:17:\"uagb\/forms-accept\";i:0;s:19:\"uagb\/forms-checkbox\";i:0;s:15:\"uagb\/forms-date\";i:0;s:16:\"uagb\/forms-email\";i:0;s:17:\"uagb\/forms-hidden\";i:0;s:15:\"uagb\/forms-name\";i:0;s:16:\"uagb\/forms-phone\";i:0;s:16:\"uagb\/forms-radio\";i:0;s:17:\"uagb\/forms-select\";i:0;s:19:\"uagb\/forms-textarea\";i:0;s:17:\"uagb\/forms-toggle\";i:0;s:14:\"uagb\/forms-url\";i:0;s:14:\"uagb\/gf-styler\";i:0;s:15:\"uagb\/google-map\";i:0;s:11:\"uagb\/how-to\";i:0;s:16:\"uagb\/how-to-step\";i:0;s:9:\"uagb\/icon\";i:0;s:14:\"uagb\/icon-list\";i:3;s:20:\"uagb\/icon-list-child\";i:9;s:10:\"uagb\/image\";i:1;s:18:\"uagb\/image-gallery\";i:0;s:13:\"uagb\/info-box\";i:0;s:18:\"uagb\/inline-notice\";i:0;s:11:\"uagb\/lottie\";i:0;s:21:\"uagb\/marketing-button\";i:0;s:10:\"uagb\/modal\";i:0;s:18:\"uagb\/popup-builder\";i:0;s:16:\"uagb\/post-button\";i:0;s:18:\"uagb\/post-carousel\";i:0;s:17:\"uagb\/post-excerpt\";i:0;s:14:\"uagb\/post-grid\";i:0;s:15:\"uagb\/post-image\";i:0;s:17:\"uagb\/post-masonry\";i:0;s:14:\"uagb\/post-meta\";i:0;s:18:\"uagb\/post-taxonomy\";i:0;s:18:\"uagb\/post-timeline\";i:0;s:15:\"uagb\/post-title\";i:0;s:20:\"uagb\/restaurant-menu\";i:0;s:26:\"uagb\/restaurant-menu-child\";i:0;s:11:\"uagb\/review\";i:0;s:12:\"uagb\/section\";i:0;s:14:\"uagb\/separator\";i:5;s:11:\"uagb\/slider\";i:0;s:17:\"uagb\/slider-child\";i:0;s:17:\"uagb\/social-share\";i:0;s:23:\"uagb\/social-share-child\";i:0;s:16:\"uagb\/star-rating\";i:0;s:23:\"uagb\/sure-cart-checkout\";i:0;s:22:\"uagb\/sure-cart-product\";i:0;s:15:\"uagb\/sure-forms\";i:0;s:22:\"uagb\/table-of-contents\";i:0;s:9:\"uagb\/tabs\";i:0;s:15:\"uagb\/tabs-child\";i:0;s:18:\"uagb\/taxonomy-list\";i:0;s:9:\"uagb\/team\";i:0;s:16:\"uagb\/testimonial\";i:0;s:14:\"uagb\/wp-search\";i:0;s:19:\"uagb\/instagram-feed\";i:0;s:10:\"uagb\/login\";i:0;s:17:\"uagb\/loop-builder\";i:0;s:18:\"uagb\/loop-category\";i:0;s:20:\"uagb\/loop-pagination\";i:0;s:15:\"uagb\/loop-reset\";i:0;s:16:\"uagb\/loop-search\";i:0;s:14:\"uagb\/loop-sort\";i:0;s:17:\"uagb\/loop-wrapper\";i:0;s:13:\"uagb\/register\";i:0;s:19:\"uagb\/register-email\";i:0;s:24:\"uagb\/register-first-name\";i:0;s:23:\"uagb\/register-last-name\";i:0;s:22:\"uagb\/register-password\";i:0;s:30:\"uagb\/register-reenter-password\";i:0;s:19:\"uagb\/register-terms\";i:0;s:22:\"uagb\/register-username\";i:0;}"],"rank_math_internal_links_processed":["1"],"_last_translation_edit_mode":["translation-editor"],"_wpml_media_duplicate":["1"],"_wpml_media_featured":["1"],"ast-main-header-display":[""],"ast-hfb-above-header-display":[""],"ast-hfb-below-header-display":[""],"ast-hfb-mobile-header-display":[""],"adv-header-id-meta":[""],"footer-sml-layout":[""],"stick-header-meta":[""],"header-main-stick-meta":[""],"header-above-stick-meta":[""],"header-below-stick-meta":[""],"site-post-title":[""],"site-sidebar-layout":["default"],"site-content-layout":[""],"ast-featured-img":["disabled"],"ast-breadcrumbs-content":[""],"theme-transparent-header-meta":[""],"ast-banner-title-visibility":[""],"ast-global-header-display":[""],"ast-site-content-layout":["default"],"site-content-style":["default"],"site-sidebar-style":["default"],"rank_math_primary_category":["42"],"_top_nav_excluded":[""],"_cms_nav_minihome":[""],"rank_math_title":["Steel or concrete industrial building: Which one should you choose?"],"rank_math_description":["Steel industrial building or precast concrete industrial building? We compare cost, timelines, and flexibility so you can make your choice without delays or cost overruns. "],"rank_math_focus_keyword":["steel industrial buildings, precast concrete industrial buildings, pre-engineered buildings, prefabricated steel buildings, metal-framed buildings"],"_thumbnail_id":["18681"],"_wpml_word_count":["2404"],"_wpml_media_has_media":["1"],"rank_math_analytic_object_id":["243"],"_uag_css_file_name":["uag-css-19009.css"],"_uag_js_file_name":["uag-js-19009.js"]},"uagb_featured_image_src":{"full":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",1264,843,false],"thumbnail":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",150,100,false],"medium":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",300,200,false],"medium_large":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",768,512,false],"large":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",1024,683,false],"1536x1536":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",1264,843,false],"2048x2048":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",1264,843,false],"wpca-thumb":["https:\/\/jansametal.com\/wp-content\/uploads\/2026\/09\/nave_acerovshormigon.jpg",220,147,false]},"uagb_author_info":{"display_name":"Jansa Metal","author_link":"https:\/\/jansametal.com\/en\/author\/nathalie\/"},"uagb_comment_info":0,"uagb_excerpt":"You&#8217;re going to invest hundreds of thousands of euros in an industrial building, and deep down, you&#8217;re probably concerned about two things above all: keeping the budget under control and completing the project on time. that the budget doesn\u2019t spiral out of control and that it\u2019s completed on time. And for good reason: according to&hellip;","_links":{"self":[{"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/posts\/19009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/comments?post=19009"}],"version-history":[{"count":10,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/posts\/19009\/revisions"}],"predecessor-version":[{"id":19037,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/posts\/19009\/revisions\/19037"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/media\/18681"}],"wp:attachment":[{"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/media?parent=19009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/categories?post=19009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jansametal.com\/en\/wp-json\/wp\/v2\/tags?post=19009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}