Industrial building construction

Industrial buildings on time.

We erect 1,000 m² of structure in one week. Each building is designed for your site and your activity.

1,000 m²

of structure erected in one week

10,000 m²

fabricated and supplied per month

EXC3

EN 1090 certification for structural steel fabrication

Bolted

Erected with no site welding

Building structure on site
Frames and bracing of the building
Logistics building with the steel structure erected

Made to measure

You choose how far we go.

Turnkey

We take care of everything, from design to handover.

Erected structure

We design, fabricate and erect the structure.

Supply

We deliver the structure for your team to erect.

Engineering only

We design and calculate your building.

JANSPAN system

How we build your industrial building.

01 · Fabrication

Numbered parts, ready to erect.

Every part leaves our La Roca del Vallès factory numbered and with its erection drawing. On site, it is bolted together.

Plate girders fabricated for a project in the Jansa Metal workshop

02 · Schedule

Your building progresses in phases.

While we erect one phase, we fabricate the next. On large projects we can pre-assemble the structure on the ground and lift up to 10,000 m² in one week.

Phase 1Phase 2Phase 3FabricationErection

03 · Design

Made to measure, not from a catalogue.

Large clear spaces, heights of 12 m or more and provision for overhead cranes. Production, offices and cold storage can share the same building.

3D model of an industrial building structure

Uses

A building for every activity.

Industry and logistics

Large floor areas, wide doors and overhead cranes.

Agricultural and livestock

Fully or partly enclosed, with natural ventilation.

Commercial

Façades to your taste and natural daylight.

Why steel

Three advantages you notice years later.

Long spans

Spans of 30, 40 or even 60 m, with a column-free interior to lay out as you wish.

Lighter foundations

A lightweight structure puts less load on the ground, and on soft soils that makes a big difference to the bill.

Ready for robotics

It adapts to new automated storage and production layouts, with millimetre precision.

Real lead times

How long your building takes.

EngineeringFabricationErection
Simple building60-100 t
2-33-52-3
7-11weeks
Complex building200-800 t
3-55-103-6
11-21weeks

Indicative times in weeks, with finalised engineering, checked anchors and good coordination. Fabrication and erection partly overlap with the civil works.

Reviews

What our clients say.

Our experience was like clockwork: this day we start, that day we finish.

Miquel Llonch Engineer and managing director, Tonsa

A supplier you can contact almost 40 years later who answers, knows their product, gives you solutions and treats you in a way that is both professional and personal is a treasure.

Rodrigo de Febrer Port Ginesta

They don’t mess around there, they get straight to the point. They roll up their sleeves with you. There’s no distance, there’s closeness.

Miquel Llonch Engineer and managing director, Tonsa

Structurally the building is impeccable, almost 40 years after it was built.

Rodrigo de Febrer Port Ginesta

FAQ

What we are asked most.

How much does a steel industrial building cost?

It depends on floor area, height, cladding, location and loads. As a guide, the JANSPAN structure, excluding foundations and services, costs from €80 to €180/m².

How long does it take to build an industrial building?

Fabricating and supplying the structure takes 6 to 10 weeks from approval of the detailed design. The structure of a 1,000 m² building is erected in one week. The cladding schedule depends on each project.

Can the building be extended later?

Yes. Steel lets you extend, strengthen or modify the structure over the years.

What cladding do you use?

Sandwich panel from 40 to 200 mm thick, in any RAL colour. It encloses, insulates and comes finished in a single element.

Does a steel building insulate well and resist fire?

Yes, with the right solutions: high-insulation sandwich panels and passive protection that achieves the fire resistance required by regulations.

What corrosion protection does it have?

Depending on the environment, shot blasting, shop primer and finishing paint. For demanding environments, higher-protection or duplex systems.

How does the bolted system work?

We use variable-section steel members joined with pre-calculated bolted connections. Each part is numbered and delivered with its erection drawing.

What can be customised?

The frame span, clear height, roof pitch, position of doors and windows, and capacity for an overhead crane or other suspended loads.

Form

Tell us about your building.

Tell us the floor area, use and location, and we will prepare a proposal.

PDF, JPG, PNG, DWG, DXF, IFC or ZIP, up to 15 MB in total.

What helps us assess it

  • The type of project and its use
  • The approximate floor area
  • The location
  • Drawings, if you have them

Prefer to talk?

(+34) 93 842 34 55
hello@jansametal.com

Monday to Friday, 7:00 to 15:00 (CET)
P.I. Can Massaguer, La Roca del Vallès (Barcelona, Spain)