Offsite steel construction
The build happens in the factory.
Your building is fabricated while the site is prepared. It arrives numbered, it is bolted together and you start using it sooner.
±1 mm
fabrication accuracy
18-20
trucks for a whole 6,000 m² building
1,000 m²
of structure erected in one week
100 %
of the steel is recyclable



What it is
Moving the build into the factory.
We design everything in 3D, fabricate with machines in a controlled environment and deliver parts to site ready to bolt.
The site becomes a fast, clean assembly operation. Every part arrives numbered, with its erection drawing, and fits exactly where it should.

Why it pays off
Six solid reasons.
You start earning sooner
While the ground is being excavated, we are already fabricating. If you start production 2 or 3 months earlier, on logistics and industrial projects that time can be worth more than €100,000.
A reliable date
It never rains in the factory. Production carries on even when the weather is bad on site, and erection is measured in days.
A budget without surprises
Problems are solved on screen, where corrections are cheap, and the build is fully defined before the first part is cut.
Factory quality
Numerical control, inspections and ±1 mm accuracy. Quality no longer depends on the day’s weather or each operator’s skill.
Less work on your site
Fewer trucks, fewer people and less storage space. Ideal on busy industrial estates and tight plots.
A building that grows with you
A bolted structure can be extended, modified or dismantled without demolition, and adapts to new robotic lines.

The time factor
The structure sets the pace for the whole project.
On many projects the structure accounts for no more than 20% of the budget, but it drives the cost and schedule of everything else.
With dry erection, as soon as an area is erected the next trades can move in. And because what is on the drawing is what gets built, you can order windows, façades and services in advance.
Real lead times
How long it really takes.
Indicative times in weeks, with finalised engineering, checked anchors and good coordination. Fabrication and erection partly overlap with the civil works.
How we meet the date
One system, from the foundations to the last bolt.
Finalised engineering
Calculations, 3D model and detailed design are approved before the first section is cut.
Checked anchors
They are surveyed before and after the concrete pour. Without a signed setting-out certificate, erection waits.
Bolted connections
They are tightened to the required torque. Predictable timing and quality control without slowing the site.
Parts in erection order
They leave the factory marked and sorted in the site sequence, and the crew arrives having studied the 3D model.
Where it applies
Our systems.
Reviews
What our clients say.
FAQ
What we are asked most.
What is offsite construction?
It means building in the factory what is traditionally done on site. The structure is designed in 3D, fabricated under numerical control and arrives on site ready to bolt together.
How much time does it save?
It depends on the project. A simple industrial building can be ready in 7 to 11 weeks, because the factory and the foundations progress at the same time.
Is it more expensive than building on site?
You need to look at the total cost: foundations, schedule, transport, maintenance and what it is worth to start production earlier. We help you work it out with your own figures.
Does it mean it comes from a catalogue?
Quite the opposite. Every structure is designed for its site, its use and its floor area. What is industrialised is the fabrication process.
What happens if it rains?
Fabrication carries on. Strong wind can stop a crane, which is why a good programme includes contingency days in winter.
Is it a sustainable option?
Steel is 100% recyclable, the structure can be dismantled and reused, and transport needs far fewer trucks.
When do you need to move in?
Tell us your timeline and we will run the numbers with your real data.