
Multi-storey building construction
Steel buildings JANSBUILD.
Our steel building system: every part is fabricated in La Roca del Vallès and arrives on site ready to bolt.
2 floors
per week, maximum erection rate
EXC3
EN 1090 certification for structural steel fabrication
Bolted
Erected with no site welding
21 countries
where we have built



JANSBUILD building system
A faster, more controlled build.
JANSBUILD is our steel system for residential, office and commercial buildings, where fabrication accuracy and speed of erection are decisive.
We work with developers, contractors, engineering firms and architects who need a fabricator with in-house design, a 3D model and EN 1090 certification.

What makes JANSBUILD unique
Four reasons to build in steel.
Speed of construction
You can erect up to two floors per week. A 6-storey building can have its structure completed in 3 weeks. Less time on site means lower cost and fewer surprises.
Sustainability
Steel is recyclable, and the structure allows buildings to be designed for dismantling, extension or conversion without demolition.
Strength and safety
Steel reduces the load on the foundations. If your project needs an earthquake-resistant structure, we design and fabricate it to the regulations of the area.
Precision and Just in Time
What is on the drawing is what gets built. So you can place orders for windows, façades and panels early, and coordinate your suppliers from day one.
A simple process from start to finish
From design to structure on site.
01 · Tailored design
Your project, modelled in 3D.
We adapt each structure to your building and coordinate structure, services and envelope before fabrication.

02 · Fabrication
Everything comes from our factory.
We produce the parts in La Roca del Vallès under EN 1090 quality control. Every part is numbered and comes with its erection drawing.

03 · Fast erection
Bolted, clean and safe.
While we erect one phase, we fabricate the next. Bolted connections avoid site welding and speed up erection.
04 · Precision from the start
The dimensions on the drawing are the dimensions on site.
You can buy windows, façades and panels early, and coordinate all trades in advance.

Steel projects
For any type of building.
A steel structure adapts to every architectural brief, from a production plant to a large hotel.

Industrial buildings
Production buildings, high-bay warehouses and buildings with special loads, with long spans and provision for overhead cranes.
Commercial and retail
Large retail stores, leisure centres and mixed-use buildings, with customisable façades and natural daylight.
Residential
Housing developments, apartments and residential complexes, compatible with any envelope and finish.
Bespoke and complex
From sports facilities to offices with complex geometries.
For architects and engineers
Your technical extension.
We carry out preliminary sizing, optimise sections and check compliance before any financial commitment. If you decide to fabricate with us, the structural design is free of charge.
We provide the calculations, the 3D model and fabrication coordination so your team can focus on the project.
Building services
Everything resolved before fabrication.
We draw the structure in 3D with the services inside, so nobody has to cut or improvise on site.
Beams can leave the factory with their service openings and castellations already calculated. Ducts pass cleanly through the structure.

Seismic zones
A structure ready for earthquakes.
Ductility
Steel deforms in a controlled way before failing, absorbing energy.
Less weight
Less mass means lower seismic forces on the structure and foundations.
Specific calculation
We include seismic action to NCSE-02 and Eurocode 8, with connections and bracing designed for it.
Easy to strengthen
Future alterations are simple and can be made without demolition.
Reviews
What our clients say.
FAQ
What we are asked most.
What is JANSBUILD?
It is our industrialised building system for multi-storey steel-framed buildings. It combines factory fabrication with bolted erection on site.
How does it build two floors per week?
Every beam, column and connection is fabricated in our plant, numbered and delivered with its erection drawing. On site, parts are bolted together in a planned sequence and arrive when they are needed.
Which buildings are ideal for JANSBUILD?
Residential buildings, shopping centres, offices, hotels, sports facilities and industrial buildings with high loads. Also projects in seismic zones or with weight limits on the foundations.
How does it reduce concrete use and waste?
Because everything is fabricated in the plant, the structural phase involves almost no wet works: no formwork and no curing times. Concrete is kept for the foundations.
How does it make Just in Time supply easier?
The 3D model contains the exact dimensions of every element before work starts on site. That means windows, façades, panels and finishes can be bought early.
What makes these structures lightweight and earthquake-resistant?
Steel has a high strength-to-weight ratio, and its ductility helps dissipate the energy of an earthquake. We calculate the response of each structure to the applicable regulations.
What are the benefits for sustainable construction?
Factory fabrication reduces waste on site, steel is recyclable and the building can be dismantled or converted, extending the life of the investment.
How long does a multi-storey building take?
As a guide, a building of 400 to 1,000 t takes 16 to 27 weeks across engineering, fabrication and erection, partly overlapping with the civil works.
Is a steel structure earthquake-proof on its own?
The quality of the design is what decides. Connections, bracing, structural regularity and ground conditions are the critical points, and we study them on every project.
Tell us about your building.
Tell us the building type, number of floors and approximate floor area. We will carry out preliminary sizing with no obligation.