Intumescent paint.

In our plant we apply the exact thickness each member needs, to protect your structure for up to 120 minutes.

120 min

of protection, maximum

Member by member

Thickness calculated for every section

RAL

Finish in the project colour

In the workshop

It leaves ready to erect

Beams with the primer coat before the intumescent paint
Beams with the intumescent coat applied in the factory
Beam with intumescent paint and topcoat

What it is

A thin layer that holds back heat.

When cold, it is a thin paint. From around 200 °C it expands and forms an insulating foam that slows the heating of the steel.

The section therefore takes longer to reach its critical temperature and withstands the minutes required by the regulations, with a smooth finish that leaves the structure exposed.

Steel beams with smooth intumescent paint finish at the Jansa Metal factory

Why in the workshop

Better in the factory than on site.

Process control

Shot-blasted surface, stable environment and thicknesses checked member by member.

Better planning

It fits into the fabrication schedule, with no need to coordinate a subcontractor on site.

Careful finish

Controlled conditions and an even finish.

Less work on site

The structure arrives protected and ready to erect.

How we do it

From calculation to delivery.

1. We define the R

According to the building use and the applicable regulations.

2. We calculate each member

Critical temperature and section factor, to EN 1993-1-2.

3. We set the thickness

The one that matches each element and the chosen system.

4. We prepare the surface

SA 2½ shot blasting and primer.

5. We apply and cure

In the plant, with thickness checks.

6. We deliver

Identified parts, ready for erection.

Steel beams with intumescent paint at the factory

Calculate before you paint

Pay only for the paint you need.

Applying the thickness of the worst-case section across the whole project multiplies product use without improving safety.

That is why we start with the fire resistance design. For outdoor and humid environments we combine it with our industrial painting and a sealing topcoat.

FAQ

What we are asked most.

What is intumescent paint?

It is a coating that expands with heat and forms an insulating foam. It protects the steel so that it withstands the minutes required by the regulations.

How is it different from fire-retardant paint?

Fire-retardant paint slows flame spread across the surface. Intumescent paint protects the structure from heat so it does not fail.

How much protection does it give?

Up to 120 minutes, depending on the system, the section and the design conditions of each project.

What thickness do I need?

It depends on the required R, the load and the section factor of each section. We calculate it member by member.

How long does it take?

Painting and curing in the workshop take 1 to 2 days depending on thickness. Thicker coats need longer curing.

What do you need for a quote?

Basic drawings of the structure, the building use and the required resistance level. If you do not know it, we will determine it.

Protect your structure.

Send us the drawings and building use, and we will calculate what each member needs.