The challenge
More than 2,000 tonnes of structure on very demanding deadlines, with the work organised in phases.
What we did
Jansa Metal was responsible for the engineering, fabrication, erection and dismantling of the structure, as well as the stairs, the most complex phase. Cladding was outside our scope.
Result
The first phase, the structure, was completed a month ahead of schedule. Dismantling took place after the event, in September.