The question comes up at almost every first project meeting: is concrete or steel cheaper? The honest answer, from someone who has been doing this for four decades, is: it depends on what you are calculating. If you only look at the price per m² of structure, concrete may look cheaper on paper. But if you calculate what the project really costs you — the time until you start production, what you pay in maintenance over 20 years, and what the building is worth when you decide to extend or sell it — the analysis changes completely.
That is called TCO, Total Cost of Ownership. And it is exactly what we are going to break down here, with real numbers and without giving an inch on technical rigour.
Why comparing the initial price is misleading
When someone asks for a quote for an industrial building, the first thing they get is construction cost per square metre. And those figures, without context, lead to the wrong decisions.
A steel-framed industrial building currently costs, in 2026, between €180 and €300/m² for the structure and basic cladding. The same building in precast concrete comes to around €260 to €450/m². The difference is already significant. But that is only the cost of the shell. It does not include:
- The cost of time until you can operate
- Foundations, which vary significantly with the weight of the structure
- The site space required and the associated logistics
- Site personnel and the real duration of the process
- Maintenance at 10, 20 and 30 years
- Flexibility, or the lack of it, to extend or modify
- The building’s residual value at the end of its life
If you want to make a well-founded decision, you have to look at all these factors together. That is TCO.
The advantage nobody puts in the spreadsheet: time, precision and site efficiency

Workshop fabrication, erection in days
A 2,000 m² steel-framed industrial building can be erected in 1 to 2 weeks once the foundations are ready. A 300–500 tonne multi-storey structure, in 4 to 8 weeks. The reason is simple: fabrication happens in the workshop, in parallel with site preparation, and what arrives on site is marked, numbered and ready to assemble. It is like assembling furniture on a large scale: every part has its exact place, everything fits, and the process moves forward without waiting or improvisation.
With concrete you have to erect formwork, wait for curing, coordinate in-situ pours and manage considerably more complex site logistics. Schedules stretch and, with them, costs.
Millimetre precision that eliminates knock-on delays
Steel sections are fabricated to tolerances of ±1–2 mm in the workshop under an industrialised, traceable process. That has a direct and very valuable consequence: windows, façades and services can be planned and ordered early with no risk that they will not fit.
With concrete, tolerances are wider and re-setting out on site is common. What matched on the drawing does not always match in reality. That causes knock-on delays and extra costs. With steel structures, it simply does not happen.
Less site space, fewer people, less friction
Erecting in-situ or precast concrete takes space: storage areas, formwork platforms, auxiliary cranes, heavy truck movements. On established industrial estates or tight plots, that space simply does not exist. A steel structure needs only what is necessary: an orderly unloading area and working space for the erection crew.
The process also needs fewer workers and a specialist team that works in a coordinated, efficient way. Delays are practically impossible except for errors at the design stage — and that is where they are prevented.
What does this mean in real money?
If a company starts production 2–3 months sooner, that time has a direct economic value: sales not lost, temporary premises not rented, staff who can start sooner. On logistics or industrial projects of a certain size, that saving easily exceeds €100,000. Sometimes much more. That money does not appear in any construction quote. But it exists.
Foundations: the invisible cost that makes the difference
Steel’s specific strength is much higher than concrete’s: for the same weight of material, a steel section carries much greater loads. That is why a complete steel structure can weigh 3 to 5 times less than its concrete equivalent, significantly reducing the loads the foundations must carry.
On soft soils — very common in industrial areas along the Mediterranean coast or on made ground — the foundations for a concrete structure can account for 15% to 25% of the total cost. With steel, that percentage falls substantially. And because less earth is moved and loads are lighter, this phase is also shorter.
Long column-free spans: steel has no rival
In industrial, logistics and storage buildings, clear span is a critical factor. With steel, spans of 30, 40 or even 60 metres are perfectly achievable with trusses or special frames. Beyond spans of 20–25 metres, concrete stops being technically and economically competitive: the prestressed girders required are very heavy elements, difficult to transport, expensive to erect and generate huge foundation loads. Steel is the only viable option.
Add to this a growing market factor: the shortage of skilled professionals to build large concrete structures is increasing across Europe. Specialist steel erection teams, by contrast, work with industrialised processes that depend less on the availability of craft labour.
Fire resistance: from perceived weakness to complete service
Fire protection is often cited as a disadvantage of steel structures. But the reality is more nuanced — and more favourable to steel than is usually explained.
First, concrete also loses load-bearing capacity at high temperatures: it is not immune to fire, it simply responds differently. Second, passive fire protection for steel structures is today a standard, economical and fast process: intumescent paint, sprayed mortar or combined systems that meet regulatory requirements without significant extra cost or time.
At Jansa Metal we also offer complete fire compartmentation: we do not just protect the structure, we design and install the compartmentation solutions each project requires under the regulations. Fire protection is not a problem: it is part of our complete service.
Sustainability and green steel: the future is already here
In 2026, the carbon footprint is no longer just a marketing argument: it is becoming a technical, financial and commercial criterion on many projects. The EU taxonomy, ESG reporting, BREEAM and LEED certification, and the coming obligation to calculate whole-life carbon in new buildings are pushing the industry to justify construction choices with environmental data. In this scenario, steel clearly comes out ahead.
- Structural steel has an average recycled content of 70–90% and is 100% recyclable indefinitely without loss of properties.
- Green steel, produced in electric arc furnaces with renewable energy, is already commercially available and cuts CO2 emissions from the steelmaking process by more than 70%.
- A steel structure can be dismantled, reused or extended without demolishing the building. The circular economy applied to construction.
- Transporting a 2,000 m² steel building to site takes 4–8 trucks. The same building in precast concrete can require 40–60 heavy truck movements, with everything that means in emissions, abnormal-load permits and logistics coordination.
Concrete generates approximately 900 kg of CO2 per tonne of cement produced. And when the building reaches the end of its life, it generates a volume of rubble with practically no recovery value. Steel has real residual value: it is traded on the market even as scrap.
The honest comparison, factor by factor
There is no universal winner. The right answer depends on the project. What we can do is show you the full analysis, without claiming advantages that do not exist:
| Factor | Steel structure | Precast concrete |
|---|---|---|
| Structure cost (€/m²) | €180–300/m² · savings of up to 40% | €260–450/m² |
| Foundations | 3–5× lighter: lower cost and shorter schedule | Heavier and more expensive due to greater self-weight |
| Erection time | Weeks · workshop fabrication in parallel with site work | Longer: formwork, curing, in-situ coordination |
| Site space | Minimal: orderly unloading and direct erection | Extensive: formwork, auxiliary cranes, storage areas |
| Site personnel | Small team, industrialised process, no improvisation | More workers for longer; higher risk of delays |
| Dimensional accuracy | ±1–2 mm from the workshop: windows and services can be ordered early without risk | Wider tolerances: frequent re-setting out and knock-on delays |
| Fire resistance | Standard passive protection + complete fire compartmentation | Inherent, but concrete also loses strength at high temperatures |
| Maintenance (25 years) | Low with correct initial protection (galvanising, epoxy, duplex system) | Low in standard environments, but with real long-term defects |
| Long column-free spans | Up to 60 m and beyond · unrivalled above 25 m | Not economically viable above 20–25 m |
| Flexibility and extensions | High: new bolted frames, production keeps running | Very low: partial demolition, re-setting out, major works |
| Sustainability | 70–90% recycled · 100% recyclable · green steel available | High CO2 footprint from cement · rubble with no residual value |
| Transport to site | 4–8 trucks for a 2,000 m² building | 40–60 heavy truck movements with special permits |
| Residual value | High: demountable, reusable, value on the scrap market | Practically nil |
| Unusual geometries | Very high versatility: cantilevers, curved roofs, complex façades | Limited: standard geometries with conventional formwork |
A real example to put numbers on it
A 2,000 m² industrial building in the Barcelona metropolitan area, 8 metres clear height, no overhead crane and standard cladding.
| Option A — Steel structure |
| Structure + cladding: ~€420,000 (€210/m²) Lighter foundations: ~€60,000 Corrosion protection (shot blasting + epoxy): ~€18,000 Fire protection and compartmentation: included in the overall project Time to operation: 14–18 weeks |
| Estimated total: ~€498,000 |
| Option B — Precast concrete |
| Structure + cladding: ~€580,000 (€290/m²) Reinforced foundations: ~€95,000 Formwork management and coordination: extra cost not always budgeted Time to operation: 22–28 weeks |
| Estimated total: ~€675,000 |
Direct difference in initial investment: ~€177,000 in favour of steel. If we also quantify 2–3 months less until production starts — with a conservative impact of €60,000 in revenue not lost or costs avoided — the real difference exceeds €230,000. And that is without counting the extra value if, in 5 years, the company needs to extend the building: in steel, adding 1,500 m² is a matter of weeks. In concrete, it is a major project.
This is an indicative calculation, not a quote. Every project has its own constraints. But it illustrates the orders of magnitude involved when the full analysis is done.
When to choose a steel structure
After more than 40 years and more than 4,000 completed projects, this is our recommendation. Choose a steel structure when:
- The start-up date is a critical business variable
- The project may need extensions or modifications in the future
- The building requires long column-free spans (from 20 m, steel has no rival)
- The plot is tight or hard to access for concrete plant
- The ground is soft or deep foundations would significantly increase cost
- Sustainability is a project or environmental certification requirement
- The geometry is irregular or the architectural design has special requirements
- You want an asset with real residual value that can be dismantled or relocated
And on many projects the best solution is a hybrid structure: concrete columns or floors where they add value, and steel where speed, clear span or flexibility matter. No dogma. Just engineering.
How we help you calculate your project’s TCO
At Jansa Metal we do something very few fabricators offer: a preliminary analysis with no obligation. Before there is a formal quote on the table, our engineering team can prepare a comparative estimate of your project’s total cost in steel, using the real data for your plot, your business and your timeline, so you can decide with numbers, not hunches.
It is not a sales trick. It is the only way to do our job properly.